成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

亚洲一卡2卡3卡4卡5卡6卡| 亚洲AV无码AV男人的天堂| 亚洲精品乱码久久久久66| 人人玩人人添人人澡欧美| 亚洲免费观看在线视频| 四虎永久在线精品免费一区二区| 久久精品亚洲AV无码四区毛片| 激情综合一区二区迷情校园| 亚洲国产精品无码久久久蜜芽| 亚洲熟妇无码爱V在线观看| 人妻丝袜AV中文系列先锋影音| 亚洲精品无码AV人在线观看| 无码视频免费一区二区三区| 免费无码AV片在线观看潮喷| 浓毛老太交欧美老妇热爱乱| 全免费A级毛片免费看无码| AV鲁丝一区鲁丝二区鲁丝三区| 中文无码乱人伦中文视频播放| 男女性爽大片视频免费看| 97超级碰碰碰久久久久| 美女黄18以下禁止观看免费的| 人妻夜夜爽天天爽三区丁香花| 国产办公室秘书无码精品99| 美女黄18以下禁止观看免费的| 在线天堂中文官网| 奷小罗莉在线观看国产| 午夜成人亚洲理伦片在线观看| 无码专区视频精品老司机| 久久久一本精品99久久精品88| 亚洲国产日韩A在线亚洲| 伊人久久大香线蕉午夜AV| 亚洲国产一区二区三区在观看| 国产初高中生在线视频| 无码高潮少妇毛多水多水免费| 国产乱码精品一区二区三区四川人| 精品人妻中文AV一区二区三区| 日韩精品中文字幕无码一区| 女人三A级毛片视频| 亚洲精品乱码久久久久久不卡| 国产精品无码专区| 日产亚洲一卡2卡3卡4卡网站|