成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

亚洲国产成人精品无码区花野真一| 不卡无码人妻一区三区| 色偷偷AV男人的天堂京东热| 国产超A级动作大片中文字幕| 久久综合亚洲色一区二区三区| 免费看18禁止观看黄网站| 日产无人区一线二线三线最新版| 亚洲精华国产精华精华好用吗| 久久国产高潮流白浆免费观看| 大肉大捧一进一出好爽视频动漫| 一本色道久久99一综合| 亚洲成A人片在线观看天堂无码| 精品久久久久久无码人妻热| 国内2020揄拍人妻在线视频| 成全电影大全在线播放| 亚洲色一区二区三区四区| 另类 专区 欧美 制服| 成人欧美日韩一区二区三区| 国产精品乱码久久久久软件| 国产香蕉视频在线播放| 一本色道久久综合亚洲精品| 亚洲成a人无码av波多野| 午夜男女很黄的视频| 久久久久精品国产亚洲AV蜜桃| 久久久久亚洲AV成人网人人软件| 国产亚洲精品第一综合另类| 国精品无码一区二区三区左线| 日本三级欧美三级人妇视频黑白配| 国产精品亚洲片在线观看不卡| 国产成人精品免费久久久久| 麻豆蜜桃国产精品无码视频综艺| 人妻在线无码一区二区三区| 亚洲A无码综合A国产AV中文| 亚洲av无码av在线播放| 亚洲高清无码视频网站在线| 国产乱码精品一区二区三区四川人| 亚洲人成无码网WWW电影榴莲| 人人妻人人藻人人爽欧美一区| 亚洲欧美在线制服丝袜国产| 精品一区二区三区波多野结衣| 蜜桃久久精品成人无码AV|