成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

国精产品一区一区三区有限| 免费无码一区二区三区A片不卡| 久久久亚洲欧洲日产无码AV| 麻豆精品一区二区综合av| 亚洲欧洲精品饰品推荐有限公司| 久久久久久精品天堂无码中文字幕| AV无码东京热亚洲男人的天堂| 亚洲乱码卡一卡二卡新区中国| 亚洲 欧美 动漫 少妇 自拍| 亚洲乱码卡一卡二卡新区| 成人无码A区在线观看视频| 18禁无码无遮挡在线播放| 老司机午夜精品视频在线观| 亚洲AV日韩AV无码污污网站| 亚洲 国产 韩国 欧美 在线| 尤物蜜芽国产成人精品区| 中文无码亚洲精品制服丝袜| 亚洲国产欧美一区二区好看电影| 在线看片免费人成视频电影| 亚洲综合国产精品第一页| av色欲无码人妻中文字幕| 色久综合网精品一区二区| 国产亚洲精品第一综合| 九九久久精品无码专区| 玩弄人妻少妇精品视频| 青青草国产精品日韩欧美| 99久久免费国产精精品| 国产成人精品免费视频网页大全| 18禁超污无遮挡无码免费网站国产| 国产成人AV大片在线播放| 熟妇丰满大屁股在线播放| 亚洲av成人无码久久精品老人| 久久自己只精产国品| 狠狠躁夜夜躁人人爽超碰97香蕉| 日产欧产美韩系列区别在哪免费| 办公丝袜AV一区二区三区| 国产三级在线观看完整版| 特级做A爰片毛片免费69| 八个少妇沟厕小便各种大屁股| 97色伦午夜国产亚洲精品| 成人网站免费看黄a站视频|