成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
无码中文字幕日韩专区| 亚洲一区二区三区无码久久| 午夜精品久久久久久久四虎| 久久久精品人妻一区二区三区蜜桃| 日韩人妻无码中文字幕视频| 人人狠狠综合久久88成人| 欧美三级不卡在线播放| 久久久久亚洲AV综合波多野结衣| 男人女人午夜视频免费| 国精产品一区二区三区糖心| 国产精品成人一区二区三区| 亚洲 欧美 日韩 国产综合 在线| 99久久精品费精品国产一区二| 一本一本久久A久久综合精品蜜桃| 亚洲精品国产品国语原创| 精品免费国产一区二区| 国产妇女馒头高清泬20P多| 小sao货揉揉你的奶真大电影| AV在线亚洲欧洲日产一区二区| 麻花豆传媒剧国产MV的用户体验| 国产亚洲欧美日韩俺去了| 欧美成人精品三级一二三在线观看| 亚洲AV无码专区国产乱码DVD| 欧美 亚洲 中文 国产综合| 人与禽性7777777| 亚洲精品无码高潮喷水在线| 国产成年女人特黄特色大片免费| 国内精品久久久久久无码| 欧美精品免费观看二区| 日韩av无码一区二区三区不卡毛片| JZZIJZZIJ日本成熟少妇| 中文字幕AV无码免费一区| 久久综合亚洲色一区二区三区| 国产强被迫伦姧在线观看无码| 欧美精品亚洲精品日韩已满十八| 国内精品免费久久久久电影院97| 99久久婷婷国产综合精品| 人人爽人人爽人人片AV免费| 暖暖视频在线观看日本| 粗大挺进朋友人妻淑娟| 免费午夜福利在线观看视频|