成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
亚洲AV蜜桃永久无码精品| 亚洲欧美日韩国产精品一区| 无人去码一码二码三码区| 国产美女高潮流白浆视频| 国产农村乱人伦精品视频| 亚洲AV无码精品蜜桃| 国产精品VA在线观看| 国产精品久久久天天影视| 狠狠躁天天躁无码中文字幕图| 国产一区二区三精品久久久无广告| 少妇熟女久久综合网色欲| 色老板精品视频在线观看| 亚洲AV无码乱码在线观看麻豆| 久久97人妻AⅤ无码一区| 国色天香精品卡一卡二卡三二百| 久久久久AV无码免费网| 日本无遮真人祼交视频| 性色AV人妻无码一区| 激情综合婷婷色五月蜜桃| 精品国产一区二区三区2021| 国产精选污视频在线观看| 国产女人喷潮视频在线观看| 国产精品成年片在线观看| 日韩精品人妻系列无码专区| 亚洲国产精品色一区二区| 亚洲AV涩涩涩成人网站在线播放| 狠狠人妻久久久久久综合| 中文字幕亚洲精品无码| 中文字幕无码精品亚洲35| 欧洲免费无线码在线一区| 人妻少妇邻居少妇好多水在线| 国产乱子伦一区二区三区视频播放| 久久久国产精品| 久久久久人妻一区二区三区| 国产精品美女久久久久AV福利| 久久本色成人综合网| 麻花豆传媒剧国产MV网站入口| 亚洲AV无码专区国产乱码在线观看| 亚洲欧美在线制服丝袜国产| 久久99精品久久久久久水蜜桃| 韩国无码一区二区三区免费视频|